ANDAMIO Scaffolding LLCMBE — NYC Certified Minority Business Enterprise
Read the project story +

Overnight precision. Ready by morning.

For a holiday-season presentation at Saks Fifth Avenue, Lucid Air electric vehicles needed to reach the lower-level Vault while the store was closed.

The brief: arrive overnight.

The vehicles had to be lowered into position without damage to the cars or the surrounding property. The presentation needed to be ready when the store reopened the next morning.

The structure behind the operation.

ANDAMIO created the support and scaffolding structure for the lowering operation. The work required attention to the operation, the property, and the limited overnight window.

Ready when the doors opened.

The vehicles were lowered safely, without damage, and in place for the morning reopening. This project shows the role a specialized structure can play when a customer brings an unusual requirement.